Previous image
A pair of 7-pin butterfly terminal/socket with clamp,  to make 14-pin butterfly laser mount. 0.125” long leads. Azimuth P/N: 5253-100-7-S2  and P/N: 5253-100-7-R2
Next image
Zoom image

A pair of 7-pin butterfly terminal/socket with clamp, to make 14-pin butterfly laser mount. 0.125” long leads. Azimuth P/N: 5253-100-7-S2 and P/N: 5253-100-7-R2


Not rated yet

Pin pitch is 0.1", so it fits standard proto-board and breadboard. You can use them to make 14-pin butterfly  laser mount (for popular 14-pin butterfly lasers).

Note: The leads of this 5253-100-7-S2/R2 are only 1/8” , 0.125” long. The diagram in 1st pdf link of specification is for general features. 0.25” long leads is true for  5253-100-7-S/R, not for this 5253-100-7-S2/R2.

It would be same as the socket used in Newport 740 series and ILX LDM 4980 series 14-pin butterfly laser mounts (see last 2 pdf links below), but you may not be able to simply replace the sockets of Newport or ILX laser mount. There are three different pin version/profiles  5253-100-7-S/R, 5253-100-7-S1/R1, 5253-100-7-S2/R2, you have to check your PCB of laser mount to figure out which version fits your PCB.

Price is for one pair of 7-pin terminal/socket only.

Out of stock
  • US$55.00
Add a different product to compare
    CONDITION:

    unused, not in original product pack.


  • DIM Weight
    0.0500 kg
  • Store Part No.
    OTI-LDC-503C
  • Manufacturers
    • Manufacturer
      Azimuth
Customer reviews
Please sign in to add review
There are no comments yet. Be the first to leave a comment

We deliver worldwide mostly by Fedex air. Fedex priority: next day to USA, 1-3 day to other countries; Fedex economy: 2 day to USA, 2-5 day to other countries. 

In Canada domestic shipping, we use UPS, Canada Post, or purolator express.

Same day shipping (Exception: Following categories: Passive Fiber Components, Fiber/Cable Spools, Part of Fiber Filter Components, Part of Fiber Patchcords/Pigtails, are in new location. We will ship in 0-2 days.)

We accept the following payment methods:Image result for visa mastercard discover logo, check, wire transfer for large order, paypal for small order, etc.

Customers who bought this product also bought
Drop items here to shop
Product has been added to your cart
  • Drag and drop me to the cart
    • US$360.00

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$310.00

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$14.50

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$195.00

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$200.00

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$600.00

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$208.00
    Only 7 left in stock

    Not rated yet
    Add a different product to compare
  • Drag and drop me to the cart
    • US$20.00

    Not rated yet
    Add a different product to compare
Customers who viewed this product bought
  • Drag and drop me to the cart
    • US$17.50

    Not rated yet
    Add a different product to compare